Washington EV Charging Grant – Level 2 Charging Where You Are
Washington is investing in clean transportation, and now’s your chance to bring EV charging to your site. Whether you're managing a multifamily property, a fleet, or a public space, you may be eligible for significant funding to install Level 2 EV chargers.
Application Window: July 8 – August 21, 2025
-
Incentive: Covers up to 80% of project costs, or up to $10,000 per EV charging port
-
Who Can Apply: Business, government, non-profit organizations in Washington
-
Funding supports projects that install 4 to 10 Level 2 plugs
-
Projects in overburdened communities may qualify for 100% funding
-
All installations must be completed within one year of grant award
Who Electrified with TurnOnGreen





Incentives & Requirements
Category / Requirement | Details |
---|---|
🔌 Qualified Projects |
Multi-unit/multi-family residential properties Publicly available EV charging stations Workplace and fleet charging |
💸 Rebate Amount | Up to $10,000 per port (up to 80%) |
📅 Application Deadline | July 8 – August 21, 2025 |
⚙️ Charger Type | Networked Level 2 chargers (9kW ~19.2 kW) |
📜 Operational Requirement | 5 years |
📍 Location | Must be within Washington State |
🧰 Installation | By a licensed electrical contractor |
Projects in overburdened communities may qualify for 100% funding
(See full guidelines for match reduction criteria.)
Required Application Documents
1. Completed Online Application Form
- Available through the Washington State Department of Ecology's online grants platform (via EAGL).
2. Project Budget and Match Documentation
-
Detailed cost breakdown of the proposed project
-
Documentation of matching funds (if applicable), including source and amount
3. Site Plan or Map
-
Clear diagram or map showing where the chargers will be installed
-
Indicate number of plugs, ADA access, and utility access
4. Charger Specifications
-
Product datasheets or technical specifications for proposed EV chargers
-
Must demonstrate compliance with minimum output, networking, and safety standards
5. Proof of Eligibility
-
Documentation proving your status as a business, non-profit, public agency, or tribal entity
6. Signed Site Host Agreement (if applicable)
-
Required if the applicant is not the property owner
-
Confirms permission to install and operate chargers at the site
7. Project Timeline
-
Include estimated start and completion dates
-
All projects must be completed within one year of grant execution

Eligible Charger
TurnOnGreen EVP1100/1900
TurnOnGreen EVP1100/1900 is a 32A - 80A level 2 EV charger. Energy star certified, rebate eligible, with adjustable power settings, the EVP1100/1900 Level 2 EV charger is ideal for hotels, fleets, multifamily properties, workplaces, commercial retail and fleet use.
-
Universally Compatible J1772 Connector (Tesla Adapter Required)
-
RFID Card Capable/QR Code Capable
-
Supports Dynamic Load Distribution
-
NEMA 3R Protection for Indoor and Outdoor Installations
-
Flexible 16’ cable to minimize clutter and potential cable damage.
-
Wall and Pedestal Mountable
Effortlessly Implement EV Charging with TurnOnGreen
From securing rebates to installing and managing your stations, we guide you through every step for a seamless transition to EV infrastructure. Contact us to save on your next project!







