SoCal Edison DC Fast Charging Rebate Program
Discover the benefits of the SoCal Edison Direct Current Fast Charging (DCFC) Program, tailored for properties with publicly accessible, short dwell time parking (less than 2 hours). This initiative is designed to significantly reduce the costs associated with the purchase and installation of DCFC charging stations, promoting the widespread adoption of electric vehicles (EVs).
Application Timeline: 04/01/2024 through 05/31/2024.
-
Stations must be publicly available.
-
Must include CCS and CHAdeMO or NACS connectors for accessibility.
-
10-year operation and maintenance commitment.
-
Infrastructure should support 150kW, regardless of current charger power.
-
Charging stations require network service for SCE data sharing.
-
Participation in a Demand Response (DR) program.
-
Use SCE-approved meters for separate equipment metering.
Who Electrified with TurnOnGreen
Eligible Charger
TurnOnGreen FSP Series 30-120kW
TurnOnGreen’s FSP Series utilizes cutting edge power modules. The modules make the DC fast charging stations customizable allowing your site to grow over time. Offer 30, 60 and 120kw power outputs in the same charging cabinet at your convenience.
-
Simultaneous charging at high kW power outputs
-
CCS1 or CHAdeMO configurations
-
Seamless web-based EV charger management dashboard
-
Optional cable management
- Optional credit card reader