Skip to content
         
 
Power Your Property Efficiently

SoCal Edison DC Fast Charging Rebate Program

Discover the benefits of the SoCal Edison Direct Current Fast Charging (DCFC) Program, tailored for properties with publicly accessible, short dwell time parking (less than 2 hours). This initiative is designed to significantly reduce the costs associated with the purchase and installation of DCFC charging stations, promoting the widespread adoption of electric vehicles (EVs).

Application Timeline: 04/01/2024 through 05/31/2024.

  • Stations must be publicly available.
  • Must include CCS and CHAdeMO or NACS connectors for accessibility.

  • 10-year operation and maintenance commitment.
  • Infrastructure should support 150kW, regardless of current charger power.
  • Charging stations require network service for SCE data sharing.
  • Participation in a Demand Response (DR) program.
  • Use SCE-approved meters for separate equipment metering.

Who Electrified with TurnOnGreen

holiday-inn-express-logo
2560px-Avis_Budget_Group_logo.svg
kisspng-e-j-gallo-winery-modesto-kazzit-inc-partners-5be1d344ccdde1.3651558615415263408391
1280px-Purdue_University_system_logo.svg
2560px-Best_Western_Hotels_&_Resorts_logo.svg
DCFC
Eligible Charger

TurnOnGreen FSP Series

TurnOnGreen’s FSP Series utilizes cutting edge power modules. The modules make the DC fast charging stations customizable allowing your site to grow over time. Offer 90, 120, 150, and 180kW power outputs in the same charging cabinet at your convenience.

  • Ultra Fast charging: Reach 80% capacity in as little as 20 minutes

  • Simultaneous charging at high kW power outputs

  • CCS1 or CHAdeMO configurations

  • Seamless web-based EV charger management dashboard

  • Optional cable management

Effortlessly Implement EV Charging with TurnOnGreen

From securing rebates to installing and managing your stations, we guide you through every step for a seamless transition to EV infrastructure. Contact us to save on your next project!