Skip to content
                            
 
Charge Up! Your Property with EV Charging Rebates

San Joaquin Valley Air District Charge Up! Program

The San Joaquin Valley Air Pollution Control District’s Charge Up! Program offers generous rebates to help you install EV chargers at your business, multi-unit dwelling, fleet depot, or government facility.

  • Incentive: Up to $5,000 per Level 2 charger and up to $25,000 per Level3 charger. Maximum $50,000 annually per applicant/site
  • Who Can Apply: If your site is located in one of the following counties, you may be eligible: Fresno, Kern, Kings, Madera, Merced, San Joaquin, Stanislaus, Tulare.

  • Applicants must commit to keeping the EV charging equipment operational and properly maintained for a minimum of 3 years.

Who Electrified with TurnOnGreen

holiday-inn-express-logo
2560px-Avis_Budget_Group_logo.svg
kisspng-e-j-gallo-winery-modesto-kazzit-inc-partners-5be1d344ccdde1.3651558615415263408391
1280px-Purdue_University_system_logo.svg
2560px-Best_Western_Hotels_&_Resorts_logo.svg

Incentives & Requirements

Category / Requirement Details
🔌 Qualified Projects

Commercial sites & office buildings
Multi-unit dwellings (MUDs)
Fleets (private or government)
Schools & universities
Nonprofits, medical centers, public agencies

💸 Rebate Amount $5,000 per Level 2 port and $25,000 per Level 3 port(30% cost share)
📅 Application Deadline Year Round
⚙️ Charger Type Networked Level 2  and Level 3 chargers
📍 Location Must be located in one of the 8 counties within SJVAPCD
🧰 Installation Must be EVITP-certified

 

Application PROCESS

1. Confirm Eligibility

  • Applicant must be a business, public agency, nonprofit, or MUD (multi-unit dwelling) located in:

    San Joaquin, Stanislaus, Merced, Madera, Fresno, Kings, Tulare, or the valley portion of Kern County.

  • Site must not be residential-only.

  • Project must involve new Level 2 or Level 3 chargers (not yet purchased or installed).

2. Complete the Application

  • Submit application at: valleyair.org/chargeup

  • Include:

    • Project location and charger type (Level 2 or Level 3)

    • Number of ports

    • Installer and EVITP certification form (if applicable)

    • Site plan and photos (if requested)

    • Disclosure of other funding sources (if any)

3. Wait for Voucher Approval

  • ⚠️ Do not purchase or install any chargers before receiving an official voucher.
  • The voucher will include the maximum funding amount and project expiration date (1 year from approval).

4. Purchase & Install the Chargers

  • Install chargers using a licensed contractor. EVITP-certified electricians required for most projects.

  • Installation must comply with:

    • Local/state/federal codes

    • ADA, MUTCD signage, and directional signs

    • At least 1 marked parking stall per charger

  • Must complete installation within 1 year of voucher execution.

5. Submit Reimbursement Package

After installation, submit proof of project completion:

  • Final invoice(s) for charger + installation

  • Proof of payment

  • Site photos showing installed chargers and signage

  • If public access: register charger location at:

  • W-9 and any other requested documentation

 

6. Receive Reimbursement

  • Reimbursement is processed by SJVAPCD after all documents are reviewed and approved.

  • ⚠️ Typical processing time: 30–60 days after approval of the reimbursement request.


EVP1100_FRONT
Eligible Charger

TurnOnGreen EVP1100/1900

TurnOnGreen EVP1100/1900 is a 32A - 80A level 2 EV charger. Energy star certified, rebate eligible, with adjustable power settings, the EVP1100/1900 Level 2 EV charger is ideal for hotels, fleets, multifamily properties, workplaces, commercial retail and fleet use.

  • Universally Compatible J1772 Connector (Tesla Adapter Required)

  • RFID Card Capable/QR Code Capable

  • Supports Dynamic Load Distribution

  • NEMA 3R Protection for Indoor and Outdoor Installations

  • Flexible 16’ cable to minimize clutter and potential cable damage.

  • Wall and Pedestal Mountable

Eligible Charger

TurnOnGreen FSP Series 60-360kW

TurnOnGreen’s FSP Series utilizes cutting edge power modules. The modules make the DC fast charging stations customizable allowing your site to grow over time. Offer 60 90, 120, 150, 180 and 360kW power outputs in the same charging cabinet at your convenience.

  • Simultaneous charging at high kW power outputs

  • CCS1 or CHAdeMO configurations

  • Seamless web-based EV charger management dashboard

  • Optional cable management

  • Optional credit card reader
FSP1200_FRONT

Effortlessly Implement EV Charging with TurnOnGreen

From securing rebates to installing and managing your stations, we guide you through every step for a seamless transition to EV infrastructure. Contact us to save on your next project!