Expand Maine’s EV Network – Incentives Available for Rural Charging Projects!
Efficiency Maine is offering financial incentives to rapidly deploy new Level 2 and DC fast chargers across rural areas of Maine. If you’re a site host, EV charger installer, or project developer, now’s your chance to access generous grants covering up to 100% of eligible costs – plus additional support to cover demand charges or battery storage costs.
-
Applications due July 1, 2025
-
Up to $150,000 per DCFC port
-
Eligible Locations:
Presque Isle, Fort Kent, Medway, Baileyville, Howland, Sherman, Turner, Hermon, Blue Hill, Milbridge, Caribou, Route 11 (Portage Lake to Masardis)$250,000 (general projects)
$10,000 (multi-family housing and government-only projects) -
Flexible project size — one site or multiple sites welcome
Who Electrified with TurnOnGreen





Rebate Incentives
Port Max Output | Capital Incentive (per Port) | Eligible Locations |
---|---|---|
19–29 kW | 100% of eligible costs, up to $25,000 | Turner, Hermon, Blue Hill (or within 15 miles), Milbridge, Caribou, Route 11 (Portage Lake to Masardis) |
30–50 kW | 100% of eligible costs, up to $50,000 | Presque Isle, Fort Kent, Medway, Baileyville (or within 15 miles), Howland, Sherman |
51–99 kW | 100% of eligible costs, up to $75,000 | Optional upgrade — can be proposed for any eligible site |
100+ kW | 100% of eligible costs, up to $150,000 | Optional upgrade — can be proposed for any eligible site |
Install new Level 2 or DC fast chargers (existing upgrades can apply but don't qualify for battery/demand charge incentives).
Chargers must be networked, publicly accessible, ADA-compliant, and meet Uptime and service requirements.

Eligible Charger
TurnOnGreen EVP1100/1900
TurnOnGreen EVP1100/1900 is a 32A - 80A level 2 EV charger. Energy star certified, rebate eligible, with adjustable power settings, the EVP1100/1900 Level 2 EV charger is ideal for hotels, fleets, multifamily properties, workplaces, commercial retail and fleet use.
-
Universally Compatible J1772 Connector (Tesla Adapter Required)
-
RFID Card Capable/QR Code Capable
-
Supports Dynamic Load Distribution
-
NEMA 3R Protection for Indoor and Outdoor Installations
-
Flexible 16’ cable to minimize clutter and potential cable damage.
-
Wall and Pedestal Mountable
Eligible Charger
TurnOnGreen FSP Series 60-360kW
TurnOnGreen’s FSP Series utilizes cutting edge power modules. The modules make the DC fast charging stations customizable allowing your site to grow over time. Offer 60 90, 120, 150, 180 and 360kW power outputs in the same charging cabinet at your convenience.
-
Simultaneous charging at high kW power outputs
-
CCS1 or CHAdeMO configurations
-
Seamless web-based EV charger management dashboard
-
Optional cable management
- Optional credit card reader

Effortlessly Implement EV Charging with TurnOnGreen
From securing rebates to installing and managing your stations, we guide you through every step for a seamless transition to EV infrastructure. Contact us to save on your next project!







