Skip to content
                           
ev cHARGING rEBATES

Charge Vermont Level 2 Public Attraction Grant

The Vermont Level 2 Public Attraction rebate program is designed to support the deployment of EV charging infrastructure at public attractions. Here are the key qualifications and requirements you need to know:

  • Eligible Locations: Public attractions such as parks, museums, historical sites, and other tourist destinations are eligible for the rebate.

  • To qualify, sites must be accessible to the public and promote sustainable travel. These locations are ideal for encouraging the use of electric vehicles by providing necessary charging infrastructure.

  • All projects must be preapproved before any construction work begins.

Who Electrified with TurnOnGreen

holiday-inn-express-logo
2560px-Avis_Budget_Group_logo.svg
kisspng-e-j-gallo-winery-modesto-kazzit-inc-partners-5be1d344ccdde1.3651558615415263408391
1280px-Purdue_University_system_logo.svg
2560px-Best_Western_Hotels_&_Resorts_logo.svg

Rebate Incentives

Incentives will support comprehensive turnkey services which include technical assistance, a design for siting of the chargers, completion of a full plan for installation, make-ready upgrades, charging hardware, and full installation of charging hardware. 

Hardware cap per OCPP compliant port 
$3,000
Make-ready work and installation
 $20,000
Level-2 grant cap per location (Capped at 12 ports) 
 $56,000

Cap per applicant for Level 2 at Public Attractions: $100,000

EVP1100_FRONT
Eligible Charger

TurnOnGreen EVP1100/1900

TurnOnGreen EVP1100/1900 is a 32A - 80A level 2 EV charger. Energy star certified, rebate eligible, with adjustable power settings, the EVP1100/1900 Level 2 EV charger is ideal for hotels, fleets, multifamily properties, workplaces, commercial retail and fleet use.

  • Universally Compatible J1772 Connector (Tesla Adapter Required)

  • RFID Card Capable/QR Code Capable

  • Supports Dynamic Load Distribution

  • NEMA 3R Protection for Indoor and Outdoor Installations

  • Flexible 16’ cable to minimize clutter and potential cable damage.

  • Wall and Pedestal Mountable

Effortlessly Implement EV Charging with TurnOnGreen

From securing rebates to installing and managing your stations, we guide you through every step for a seamless transition to EV infrastructure. Contact us to save on your next project!